Desal Bloom Watch — 2026-10-03

Satellite data from 1 Oct, 2 days ago

No plant changed level since yesterday.

Sorek A RED

Sorek B RED

Palmachim RED

Ashdod (Mekorot) YELLOW

Ashkelon YELLOW

Western Galilee GREEN

Hadera GREEN

Eilat seawater desalination (Mekorot) GREEN

Map of the chosen intake boxes coloured by level

Technical details

No plant changed level since yesterday.

PlantLevelChlorophyllData
Sorek ARED3.42 mg/m³ (>=P97)N20 VIIRS 4 km, data of 2026-10-01
Sorek BRED3.42 mg/m³ (>=P97)N20 VIIRS 4 km, data of 2026-10-01
PalmachimRED5.33 mg/m³ (>=P90)N20 VIIRS 4 km, data of 2026-10-01
Ashdod (Mekorot)YELLOW4.3 mg/m³ (>=P75)N20 VIIRS 4 km, data of 2026-10-01
AshkelonYELLOW3.53 mg/m³ (>=P75)N20 VIIRS 4 km, data of 2026-10-01
Western GalileeGREEN0.415 mg/m³ (<P50)N20 VIIRS 4 km, data of 2026-10-01
HaderaGREEN0.404 mg/m³ (<P50)N20 VIIRS 4 km, data of 2026-10-01
Eilat seawater desalination (Mekorot)GREEN0.0917 mg/m³ (<P50)N20 VIIRS 4 km, data of 2026-10-01

Data dates

Sorek A RED

Sorek B RED

Palmachim RED

Ashdod (Mekorot) YELLOW

Ashkelon YELLOW

Western Galilee GREEN

Hadera GREEN

Eilat seawater desalination (Mekorot) GREEN

How to read this report

This page explains the colours and the terms used in this report. It describes what the numbers mean; it does not tell anyone what to do.

Colour key

A level is judged on the lower of the two newest clear satellite days, so one odd day cannot move it.

GREENLooks normal for the season. Chlorophyll is below the usual high for this time of year and is not climbing.
YELLOWHigher than usual. Chlorophyll is at or above the usual high for this time of year (the top 1 in 10 of past values), or it is above normal and has been rising for 3 days.
ORANGEClearly unusual. Chlorophyll is at or above the very high mark for this time of year (the top 3 in 100), or a yellow plant has an upstream monitoring point at least 1.5 times its own usual high (an upstream signal).
REDFar outside the normal range, or unusual again after an unusual day. Chlorophyll is at least 3 times the normal for this time of year and at or above the usual high, or the plant was orange or red yesterday and is orange again today (two days running).
GREYNo level can be given. Grey is never an all-clear. There was no clear satellite view in the last 3 days, less than a quarter of the area was visible, or there is not enough past data for this time of year.

Terms

Limits

Where the numbers come from


Sources

Desal Bloom Watch is a satellite-based early-warning aid. It is not an operational decision tool and not a measurement at the intake: satellites see the top few metres, data lag about two days, and your own on-line analysers remain the real-time alarm.